
How Temporary adjustment of Theodolite is done?
Temporary adjustment of theodolite is a process of making the thoedolite ready for taking … Read more

Procedure for CBR Test, results and uses.
CBR Stands for California Bearing Ratio, introduced by the California Division of Highways to … Read more

What are Parts of septic tank?
In areas having sewerage facility the wastewater from the house is carried by the … Read more
What is theodolite? Types, Parts, and Uses.
Theodolite is an instrument used for the measurement of vertical and horizontal angles. Theodolite … Read more
What is prestressed concrete? Materials, Uses & Advantages.
The prestressed concrete is a concrete in which internal stresses are induced artificially so … Read more
What are the Storage zones of Reservoir?
A huge amount of water stored behind the dam is called a reservoir. Water stored by the reservoir during different months of the year is different. This storage is divided into different zones called storage zones of a reservoir. These are: Dead storage, Useful Storage and Surcharge storage, bank storage valley storage.
What is the Limit State method, Working Stress method, and Ultimate Load Method
There are three methods of structural design, working stress, limit state, and ultimate load method. Initially, the working stress method was used to design the Reinforced Concrete structure as well as the Steel structure.